![](https://steam-energy.eu/wp-content/uploads/2023/12/IMG20231130180040-1-845x321.jpg)
We finished installation works of a 4MW steam boiler, that works as a back-up boiler for clients 5MW pellet steam boiler. During the construction, a new gas boiler by our partner ICI Caldaie was installed along with a modulating burner and a blowdown tank. Boiler is equipped with remote control and automation system that enables to operate the steam boiler 72h continuously without supervision.